Quick answers
What is this project?
Proposed Construction of Industrial Building by Rishaba Industries LLP is an approved industrial building project in Atchivilagam, Cheyyur, Chengalpattu, Tamil Nadu. It plans 33 towers of up to 3 floors on 48.4 acres.
Who is building it?
The applicant is Rishaba Industries LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Sept 2026), as of 27 Nov 2026.
Where is it?
In Atchivilagam, Cheyyur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹236.2 crore and a site of 48.4 acres.
When was it filed?
The application was filed on 16 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Sept 2026 |
| Application filed | 16 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rishaba Industries LLP |
| Use | Industrial |
| Towers | 33 |
| Floors (tallest) | 3 |
| Height | 10 m |
| Parking spaces | 1,050 |
| Land area | 48.4 acres (19.6 ha) |
| Built-up area | 32,263 m² (3,47,276 sq ft) |
| Plot area | 1,95,787 m² (21,07,432 sq ft) |
| Project cost | ₹236.2 crore |
| Village / locality | Atchivilagam |
| Taluk / tehsil | Cheyyur |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04553 |
In context
302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 48.4 acres, this one is larger than 86% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Atchivilagam, Cheyyur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- JSRIDPL-ARIPL (JV)-Madayampakkam Ordinary Earth Quarry — lapsed, 2.2 km away
- Resort Building at Sy.No.125/1a,125/1b,125/1c, 118/25, Mugaiyur Village,… — more information requested, 3.3 km away
- Pallava Mines Rough Stone and Gravel Quarry — environmental approval granted, 3.4 km away
- Perumbakkam Village Rough Stone and Gravel Mining Lease — environmental approval granted, 3.5 km away
- Perumbakkam Village Rough Stone and Gravel Mining Lease — returned to applicant, 3.5 km away
- Perumbakkam Village Rough Stone and Gravel Lease — environmental approval granted, 3.5 km away
- M/s.Naraj Blue Metals Private Limited Rough stone and gravel quarry — environmental approval granted, 4.5 km away
- J. Sekar, Rough stone and Gravel Quarry over an Extent of 3.44.0ha S.F.Nos.… — environmental approval granted, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.