Project details
| Status | Returned to applicant |
|---|---|
| Status since | 14 Nov 2026 |
| Application filed | 7 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/S Supreme Petrochem LTD. |
| Land area | 14.6 acres (5.9 ha) |
| Project cost | ₹3.1 crore |
| Village / locality | Ariyalur |
| Taluk / tehsil | Tiruvottiyur |
| District | Chennai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04598 |
In context
14 applications in Chennai since January 2022 are in the same category (Industry): 3 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 14.6 acres, this one is smaller than 86% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ariyalur, Tiruvottiyur, Chennai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Expandable Polystyrene Unit from 550MTPM to 2750 MTPM — under environmental review, 0 m away
- Facility for Resorcinol - Formaldehyde Resin (25 Mt/ Month) Within the… — returned to applicant, 450 m away
- Facility for Resorcinol - Formaldehyde Resin (25 Mt/ Month) Within the… — returned to applicant, 450 m away
- Facility for Resorcinol - Formaldehyde Resin (25 Mt/ Month) Within the… — cleared for impact study, 450 m away
- "expansion of Production and Additional Warehouse Shed to Enhance Dipped… — returned to applicant, 450 m away
- Building project by Toshiba Jsw Power Systems Private Limited — environmental approval granted, 1.2 km away
- Proposed Expansion of Active Pharmaceutical Ingredients (APIs) Manufacturing… — cleared for impact study, 1.3 km away
- Expansion of Caustic Soda Production Capacity From 150 Tpd to 250 Tpd by… — environmental approval granted, 1.9 km away
More from M/S Supreme Petrochem LTD. in Chennai
- Expansion of existing Expandable Polystyrene Unit from 550MTPM to 2750 MTPM — under environmental review
All 3 Supreme Petrochem projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.