Project details
| Official title | Proposed Construction of Industrial Building for M/s Nahars Engineering India Pvt Ltd. |
|---|---|
| Status | Under environmental review |
| Status since | 16 Nov 2026 |
| Application filed | 10 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Nahars Engineering India Private Limited |
| Land area | 13.9 acres (5.6 ha) |
| Project cost | ₹30.4 crore |
| Village / locality | Gopanapalli |
| Taluk / tehsil | Hosur |
| District | Krishnagiri |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04636 |
In context
78 applications in Krishnagiri since January 2022 are in the same category (Buildings & townships): 53 approved, 18 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 13.9 acres, this one is smaller than 79% of them.
38 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gopanapalli, Hosur, Krishnagiri, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Factory Building by M/s. Pricol Precision Products Private Limited — environmental approval granted, 400 m away
- S.Muthuganapalli Village Ordinary Earth Mining Lease — returned to applicant, 1000 m away
- Mining project by M/s. A.S. Enterprises over an Extent of 2.13.0 ha of Patta… — environmental approval granted, 1.9 km away
- Industrial Sheds and Warehouse Park by Anantha Infra — environmental approval granted, 2.3 km away
- Industrial Sheds and Warehouse Park by Avigna Private Limited — environmental approval granted, 2.7 km away
- Industrial and Warehouse Park by Avigna Private Limited Park 2 — environmental approval granted, 2.8 km away
- Thiru.S.Raghu Rough stone Quarry — environmental approval granted, 2.9 km away
- Thiru.S.Raghu Rough stone Quarry — cleared for impact study, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.