Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Oct 2026 |
| Application filed | 6 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Sabari Foundation |
| Land area | 12.9 acres (5.2 ha) |
| Project cost | ₹194.3 crore |
| Village / locality | Kuthambakkam |
| Taluk / tehsil | Poonamallee |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04937 |
In context
119 applications in Thiruvallur since January 2022 are in the same category (Buildings & townships): 69 approved, 37 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.9 acres, this one is smaller than 67% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kuthambakkam, Poonamallee, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s Rajalakshmi Institute of Technology, a unit of Sabari… — under environmental review, 0 m away
- High Rise Residential Building with Club House by M/s. DRA Aadithya South City… — environmental approval granted, 850 m away
- New Mofussil Bus Terminus — environmental approval granted, 950 m away
- EC Corrigendum For Proposed Construction of New Mofussil Bus Terminus at… — environmental approval granted, 950 m away
- Proposed Multistoried Residential Group Development — environmental approval granted, 1.1 km away
- Proposed Multistoried Residential Group Development — cleared for impact study, 1.1 km away
- Proposed Multistoried Residential Group Development — cleared for impact study, 1.1 km away
- Ordinary Earth Quarry of Thiru.K.Elumalai — environmental approval granted, 3.2 km away
More from Sabari Foundation in Thiruvallur
- Building project by M/s Rajalakshmi Institute of Technology, a unit of Sabari… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.