Project details
| Official title | Expansion in Proposed Datacenter Project at Ambattur Village, Chennai by M/s. Ctrl S Datacenters Limited |
|---|---|
| Status | Under environmental review |
| Status since | 25 Nov 2026 |
| Application filed | 10 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Ctrl S Datacenters Limited |
| Land area | 5 acres (2 ha) |
| Project cost | ₹122.7 crore |
| Village / locality | Ambattur |
| Taluk / tehsil | Ambattur |
| District | Chennai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04948 |
What the filings say
What is planned
M/s. Ctrl S Datacenters Limited proposes to expand its existing Information Technology and Information Technology Enabled Services (IT/ITES) data centre facility in Ambattur. The applicant's project report states that the expansion involves adding a third tower (DC3) to the existing two-tower complex.
The building configuration for the project is as follows:
- Existing Tower 1 (DC1): Ground floor + 14 floors.
- Existing Tower 2 (DC2): Ground floor + 12 floors.
- Proposed Tower 3 (DC3): Basement + Ground floor + 9 floors + Terrace + Super Terrace (Chillers).
The expansion will increase the total built-up area from 78,761.92 square metres to 1,05,411.9 square metres. The project is designed to accommodate a total occupancy of 206 persons, including 117 staff members, 29 visitors, and 60 maintenance personnel.
Layout and design
The total plot area for the development is 2.03 hectares (5.02 acres). The ground coverage after expansion will be 7,901.15 square metres, representing 38.91% of the site. The area use break-up includes:
- Roads and Pavements: 3,991.65 square metres (19.66%)
- Greenbelt Development: 3,325.00 square metres (16.37%)
- Open Space Reservation (OSR): 2,112.00 square metres (10.40%)
- Surface Parking: 1,057.40 square metres (5.21%)
- Utilities (STP, Solid Waste): 1,918.80 square metres (9.45%)
Parking facilities will include 46 car parks and 118 two-wheeler spaces. The building is planned to be certified under the Indian Green Building Council (IGBC) program.
Water, power and access
The total water requirement for the expanded facility is estimated at 12 kilolitres per day (KLD). Fresh water of 4 KLD will be sourced from Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) approved vendors. Additionally, the project requires 200 KLD of Tertiary Treated Reverse Osmosis (TTRO) water for the chiller plant, also to be supplied by CMWSSB.
Power requirement will increase by 57.8 MW to a total of 177.8 MW, sourced from the TNEB grid. For backup, the applicant proposes to add 40 diesel generator (DG) sets of 2,500 kVA each, bringing the total to 115 DG sets. These will be equipped with acoustic enclosures and stacks of 93 metres in height.
The site is connected to Telephone Exchange Road, which further connects to AH45 to the east.
Environmental safeguards
A Sewage Treatment Plant (STP) with a total capacity of 40 KLD (25 KLD existing + 15 KLD proposed) using Moving Bed Biofilm Reactor (MBBR) technology will be installed. The project aims for zero liquid discharge by reusing treated wastewater for flushing (5 KLD) and greenbelt maintenance (3 KLD).
For storm water management, the applicant proposes 10 new rainwater harvesting pits (2.0 m diameter, 2 m depth) in addition to the 32 existing pits. A 120 cubic metre underground storage tank will collect roof runoff.
Solid waste generation is estimated at 42 kg per day, including 17 kg of biodegradable waste to be composted or handed over to authorized vendors. E-waste, estimated at 1.35 tonnes per year, will be collected and stored securely before being handed to authorized recyclers.
| Item | Detail |
|---|---|
| Total Land Area | 2.03 hectares (5.02 acres) |
| Total Built-up Area | 1,05,411.9 square metres |
| Expansion Built-up Area | 26,650.0 square metres |
| Total Project Cost | ₹309.24 crore (₹122.71 crore proposed) |
| Total Power Requirement | 177.8 MW |
| Total DG Sets | 115 units of 2,500 kVA |
| Total Water Requirement | 12 KLD (Domestic) + 200 KLD (Chillers) |
| STP Capacity | 40 KLD |
| Greenbelt Area | 3,325.0 square metres |
Ctrl S Datacenters Expansion in Proposed Datacenter site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
203 applications in Chennai since January 2022 are in the same category (Buildings & townships): 165 approved, 18 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5 acres, this one is larger than 51% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambattur, Chennai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Gesco Healthcare Private Limited — lapsed, 300 m away
- Proposed Construction of Data Centre With Supportive Gis Substation — returned to applicant, 500 m away
- Proposed Construction of Data Centre With Supportive Gis Substation — environmental approval granted, 500 m away
- Proposed Construction of Data Centre With Supportive Gis Substation — environmental approval granted, 500 m away
- Commercial IT/ITES Office Use Building by M/s. Kwality Precision Products… — environmental approval granted, 600 m away
- Building project by BAM Digital Realty Chennai Private Limited — returned to applicant, 900 m away
- Building project by BAM Digital Realty Chennai Private Limited — environmental approval granted, 900 m away
- "BAM Digital Realty Chennai Private Limited" {After expansion with builtup… — environmental approval granted, 900 m away
All 16 Ctrl S Datacenters projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.