Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 24 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Flextronics Technologies (India) Private Limited |
| Use | Industrial |
| Towers | 36 |
| Height | 14 m |
| Parking spaces | 5,048 |
| Land area | 100 acres (40.5 ha) |
| Built-up area | 1,14,063 m² (12,27,763 sq ft) |
| Plot area | 4,04,686 m² (43,56,000 sq ft) |
| Project cost | ₹1,643.2 crore |
| Village / locality | Santhavelur |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05122 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 100 acres, this one is larger than 84% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Santhavelur, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial Building by M/s. SRGS Property Developers Private Limited — lapsed, 500 m away
- Building project by Samsung India Electronics Private Limited — under environmental review, 500 m away
- Industrial Sheds (Manufacturing & Ware House) by M/S. Tapp Semiconductor India… — environmental approval granted, 1000 m away
- Industrial Sheds (Manufacturing & Ware House) by M/S. Tapp Semiconductor India… — returned to applicant, 1000 m away
- Proposed Expansion of Existing Special Economic Zone in Sriperumbudur Sipcot… — lapsed, 1.5 km away
- Proposed Expansion of Existing Special Economic Zone in Sriperumbudur Sipcot… — cleared for impact study, 1.5 km away
- Proposed Construction of Dorm — lapsed, 1.8 km away
- Proposed Construction of Dorm — environmental approval granted, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.