Project details
| Official title | Proposed Construction of High Rise IT Office cum Commercial (Mixed Use) Building by M/s. TIDEL Park Limited at Hosur, Krishnagiri |
|---|---|
| Status | Initial checks |
| Status since | 16 Apr 2026 |
| Application filed | 8 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Tidel Park Limited |
| Land area | 9.2 acres (3.7 ha) |
| Project cost | ₹373 crore |
| Village / locality | Mattigiri |
| Taluk / tehsil | Hosur |
| District | Krishnagiri |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05141 |
In context
78 applications in Krishnagiri since January 2022 are in the same category (Buildings & townships): 53 approved, 18 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 9.2 acres, this one is smaller than 87% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mattigiri, Hosur, Krishnagiri, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thiru.S.Raghu Rough stone Quarry — environmental approval granted, 2.9 km away
- Proposed Expansion of Powered Two Wheelers (Fuel /Electric) & Three Wheelers… — environmental approval granted, 3 km away
- Proposed Expansion of Powered Two Wheelers (Fuel /Electric) & Three Wheelers… — cleared for impact study, 3 km away
- Proposed Expansion of Industrial Sheds by M/s. Caterpillar India Private Limited — lapsed, 3 km away
- Building project by M/s. Avigna Vaya Private Limited — under environmental review, 4.3 km away
- Proposed Expansion of Steel Melting Plant & Rolling Mill by increasing the… — lapsed, 4.4 km away
- Environmental clearance for the proposed expansion of Steel Melting Plant &… — lapsed, 4.4 km away
- Environmental clearance for the proposed expansion of Steel Melting Plant &… — cleared for impact study, 4.4 km away
All 4 Tidel Park projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.