Quick answers
What is this project?
Nelvaipalayam Rough Stone and Gravel Quarry Project Belongs to Thiru. K. Sundamoorthy is an approved mining project in Nelvaypalaiyam, Cheyyur, Chengalpattu, Tamil Nadu. The site covers 4.1 acres.
Who is building it?
The applicant is K Sundramoorthy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Aug 2026), as of 27 Nov 2026.
Where is it?
In Nelvaypalaiyam, Cheyyur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹65 lakh and a site of 4.1 acres.
When was it filed?
The application was filed on 15 Jul 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Aug 2026 |
| Application filed | 15 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | K Sundramoorthy |
| Land area | 4.1 acres (1.6 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Nelvaypalaiyam |
| Taluk / tehsil | Cheyyur |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site area on record |
| Our reference | WID-TN-05149 |
In context
168 applications in Chengalpattu since January 2022 are in the same category (Mining): 127 approved, 17 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.1 acres, this one is smaller than 89% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 20.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Nelvaypalaiyam, Cheyyur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry Project Belongs to Thiru.K. Sundramoorthy — returned to applicant, 0 m away
- K. Sundramoorthy Rough stone and Gravel Quarry Project over an Extent of… — environmental approval granted, 100 m away
- K. Sundramoorthy Rough stone and Gravel Quarry Project over an Extent of… — cleared for impact study, 100 m away
- M/s.Naraj Blue Metals Private Limited Rough stone and gravel quarry — environmental approval granted, 200 m away
- TVL JSRIDPL-ARIPL(JV),M/S JSR INFRA DEVELOPRS PVT.LTD.,Akkinampattu Ordinary… — environmental approval granted, 1.1 km away
- Tvl. JSRIDPL-ARIPL (JV)_ Nelvoypalayam — lapsed, 1.1 km away
- Pallava Mines Rough Stone and Gravel Quarry — environmental approval granted, 1.5 km away
- Palur Village Rough Stone and Gravel Mine Lease — environmental approval granted, 1.9 km away