Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Aug 2026 |
| Application filed | 2 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Chennai Radha Engineering Works Private Limited |
| Use | Industrial |
| Towers | 7 |
| Floors (tallest) | 2 |
| Height | 17 m |
| Parking spaces | 555 |
| Land area | 9.8 acres (4 ha) |
| Built-up area | 21,506 m² (2,31,488 sq ft) |
| Plot area | 39,538 m² (4,25,583 sq ft) |
| Project cost | ₹26.6 crore |
| Village / locality | Mathur |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05192 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.8 acres, this one is smaller than 67% of them.
36 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mathur, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Additional Production Facility at NSK Bearings India Pvt Ltd, Oragadam — environmental approval granted, 400 m away
- Proposed Expansion of Industrial Shed — environmental approval granted, 850 m away
- Proposed Expansion of Industrial Shed — environmental approval granted, 850 m away
- Proposed 1X10 MW Coal based Co-Gen Thermal Power Plant — environmental approval granted, 900 m away
- Proposed 1X10 MW Coal based Co-Gen Thermal Power Plant — environmental approval granted, 900 m away
- Auditorium & Additional Buildings within Existing Facility of M/s Apollo Tyres… — cleared for impact study, 900 m away
- Proposed 1X10 MW Coal based Co-Gen Thermal Power Plant — environmental approval granted, 900 m away
- Proposed Expansion of Industrial Buildings by M/s. Doowon Automotive Systems… — initial checks, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.