Quick answers
What is this project?
Rough Stone and Gravel Quarry Project Belongs to Tmt. M. Lakshmidevi is an approved mining project in Mukkuttumalai, Kovilpatti, Thoothukkudi, Tamil Nadu. The site covers 4.7 acres.
Who is building it?
The applicant is M Lakshmi Devi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Mar 2026), as of 27 Nov 2026.
Where is it?
In Mukkuttumalai, Kovilpatti, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 4.7 acres.
When was it filed?
The application was filed on 10 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Mar 2026 |
| Application filed | 10 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M Lakshmi Devi |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Mukkuttumalai |
| Taluk / tehsil | Kovilpatti |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05268 |
In context
97 applications in Thoothukkudi since January 2022 are in the same category (Mining): 79 approved, 14 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.7 acres, this one is smaller than 80% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mukkuttumalai, Kovilpatti, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru.R.Raveendran — more information requested, 7.5 km away
- Rough Stone and Gravel Quarry of Thiru.S.K.P.Murugaen — environmental approval granted, 18.7 km away
- Laying of Ug Drinking Water Supply Pipeline (400 Mm Di) Across Kurumalai Rf — forest land use approved, 18.7 km away
- Chettikurichi -Rough stone and Gravel — environmental approval granted, 19.1 km away
- Thiru.S.Maheswaran Rough Stone and Gravel Quarry — environmental approval granted, 19.3 km away
- Kandasamy Chettikurichi village Roughstone Quarry — environmental approval granted, 19.4 km away
- Kandasamy Chettikurichi village Roughstone Quarry — environmental approval granted, 19.4 km away
- Kandasamy Chettikurichi village Roughstone Quarry — cleared for impact study, 19.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.