Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Aug 2026 |
| Application filed | 22 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | NAFISA Shabbir jamnagarwala |
| Use | Residential |
| Towers | 1 |
| Floors (tallest) | 17 |
| Basements | 2 |
| Height | 62 m |
| Parking spaces | 143 |
| Land area | 3,400 m² |
| Built-up area | 20,648 m² (2,22,253 sq ft) |
| Plot area | 3,420 m² (36,813 sq ft) |
| Project cost | ₹41.7 crore |
| Village / locality | Fort Tondiarpet |
| Taluk / tehsil | Tondiarpet |
| District | Chennai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05398 |
In context
203 applications in Chennai since January 2022 are in the same category (Buildings & townships): 165 approved, 18 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.8 acres, this one is smaller than 97% of them.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Fort Tondiarpet, Tondiarpet, Chennai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Government RSRM lying in Hospital from 510 to 810 Beds… — environmental approval granted, 500 m away
- Proposed reconstruction of New multi-specialty Critical and Emergency care… — environmental approval granted, 800 m away
- (S+09) Floors 504 Tenements at BRN Garden in S.NO. 2252/5pt, Block No. 20,… — environmental approval granted, 850 m away
- Proposed reconstruction of high rise residential building with 792 tenements… — environmental approval granted, 1.1 km away
- Proposed reconstruction of high rise residential building with 792 tenements… — environmental approval granted, 1.1 km away
- Capital Dredging to Increase the Turning Circles at Bharathi Dock and Dr.… — under coastal review, 1.2 km away
- Capital Dredging to Increase the Turning Circles at Bharathi Dock and Dr.… — cleared for impact study, 1.2 km away
- 776 tenements at Stanley Hospital (Seven well), scheme (Stilt + 9 Storied) in… — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.