Quick answers
What is this project?
Underground Sewerage System to Leftout areas in Maraimalai Nagar Municipality is a lapsed pipeline project in Tirutteri, Chengalpattu, Tamil Nadu. It seeks 0.3 acres of forest land.
Who is building it?
The applicant is Karthikkeyan R.
Has it been approved?
No. The application was lapsed on 1 Jul 2026, so it is no longer under consideration.
Where is it?
In Tirutteri, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹300.5 crore and 1,340 m² of forest land.
When was it filed?
The application was filed on 4 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Jul 2026 |
| Application filed | 4 Dec 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Pipelines |
| Applicant | Karthikkeyan R |
| Forest land | 1,340 m² |
| Project cost | ₹300.5 crore |
| Village / locality | Tirutteri |
| Taluk / tehsil | Chengalpattu |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05512 |
In context
7 applications in Chengalpattu since January 2022 are in the same category (Pipelines): 0 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tirutteri, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Underground Sewerage System to Leftout Areas — lapsed, 250 m away
- Diversion of Forest Land for Underground Water Pipe Line System to Leftout Areas — lapsed, 1.5 km away
- Diversion of Forest Land for Underground Sewerage System to Leftout Areas — lapsed, 1.7 km away
- Relaying and Periodical Maintenance of Valayakaranai to Appur road — lapsed, 3.4 km away
- "M/s. Valliammai Society & M/s. SRM IST" — returned to applicant, 3.9 km away
- Laying of Aerial OFC along the road side which across Gudalur R.F.,… — lapsed, 4 km away
- Formation of Approach Access to Our Patta Land S.No. 496 of Sengudram Village… — lapsed, 4.2 km away
- "Proposed construction of Dr. APJ Abdul Kalam Research Park" by M/s. SRM… — initial checks, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.