Quick answers
What is this project?
Bt Road Formation Works on the Road Between Palakanur to Kovilkollai Villages Across Thenmalai R.F. in Jawadhu Hills Block, Thiruvannamalai District is a lapsed road project in Tenmalai Reserved Forest, Jamunamarathoor, Tiruvannamalai, Tamil Nadu. It seeks 4.5 acres of forest land.
Who is building it?
The applicant is Block Development Office (Rural Development).
Has it been approved?
No. The application was lapsed on 13 Oct 2025, so it is no longer under consideration.
Where is it?
In Tenmalai Reserved Forest, Jamunamarathoor, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹1 crore and 4.5 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 7 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Oct 2025 |
| Application filed | 7 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Block Development Office (Rural Development) |
| Forest land | 4.5 acres (1.8 ha) |
| Project cost | ₹1 crore |
| Village / locality | Tenmalai Reserved Forest |
| Taluk / tehsil | Jamunamarathoor |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05595 |
In context
49 applications in Tiruvannamalai since January 2022 are in the same category (Roads & highways): 7 approved, 4 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2.3 years from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tenmalai Reserved Forest, Jamunamarathoor, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Aerial OFC along the road side across the Thenmalai R.F. (Javadi… — lapsed, 4.2 km away
- Widening and Improvements From Single Lane to Intermediate Lane for the Length… — lapsed, 4.5 km away
- Widening and Improvements from Single Lane to Intermediate Lane for the length… — lapsed, 6.9 km away
- Widening and Improvements from Single Lane to Intermediate Lane for the length… — forest land use approved, 7.1 km away
- Palamarathur Black Granite Quarry — cleared for impact study, 8 km away
- Bt Road Formation Works on Existing Road Between Nallapattu to Pathri Villages… — lapsed, 8.5 km away
- Bt Road Formation Works on Existing Road Between Attiyanur to Nachamalai… — lapsed, 9.4 km away
- Bt Road Formation Works on Existing Road From Palavari to Erumaiyanur Villages… — lapsed, 10.1 km away
More from Block Development Office (Rural Development) in Tiruvannamalai
- BT road formation works on existing Neerthombai road between Thurinjipuram to… — lapsed
- BT road formation works on existing Kanamalai road between Pallavanpatti to… — lapsed
- Bt Road Formation Works on Existing Road Between Attiyanur to Nachamalai… — lapsed
- Bt Road Formation Works on Existing Road From Palavari to Erumaiyanur Villages… — lapsed
- Bt Road Formation Works on Existing Road Between Nallapattu to Pathri Villages… — lapsed
- BT road formation works on existing Palamathi road between Melshenbagathoppu… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.