LapsedPipelines · Tiruchirappalli, Tamil Nadu

Laying of Pipe line from Kaveri river to Ground level reservoir tank in Gunaseelam panchayat of Musiri Panchayat Union

Laying of Pipe line from Kaveri river to Ground level reservoir tank in Gunaseelam panchayat of Musiri Panchayat Union is a lapsed pipeline project in Gunasilam, Musiri, Tiruchirappalli, Tamil Nadu. It seeks 0 acres of forest land. Its stated project cost is ₹3 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 16 Nov 2026).

See it on the live map All projects in Tiruchirappalli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleLaying of Pipe line from Kaveri river to Ground level reservoir tank in Gunaseelam panchayat of Musiri Panchayat Union in Trichy District of Gunaseelam Reserve Land
StatusLapsed
Status since16 Nov 2026
Application filed24 Sept 2026
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantJakir Hussain
Forest land30 m²
Project cost₹3 lakh
Village / localityGunasilam
Taluk / tehsilMusiri
DistrictTiruchirappalli
StateTamil Nadu
Location fromSite boundary on record
Our referenceWID-TN-05703

In context

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gunasilam, Musiri, Tiruchirappalli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.