Quick answers
What is this project?
Widening and strengthening of existing road from Veppanthattai to Venbavur village across Venbavur R.F. of Perambalur Forest Division is a proposed road project in Venbavur, Veppanthattai, Perambalur, Tamil Nadu. The site covers 2.3 acres.
Who is building it?
The applicant is Divisional Engineer Highways C&m Perambalur.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Venbavur, Veppanthattai, Perambalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹5.6 crore; a site of 2.3 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 16 Apr 2026.
Project details
| Official title | Widening and strengthening of existing road from Veppanthattai to Venbavur village across Venbavur R.F. of Perambalur Forest Division in Veppanthattai Taluk, Perambalur District. |
|---|---|
| Status | More information requested |
| Status since | 3 Sept 2026 |
| Application filed | 16 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Divisional Engineer Highways C&m Perambalur |
| Land area | 2.3 acres (0.9 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹5.6 crore |
| Village / locality | Venbavur |
| Taluk / tehsil | Veppanthattai |
| District | Perambalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05762 |
Where it is
Venbavur, Veppanthattai, Perambalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vengalam (East) Rough Stone Quarry Project Belongs to M/s. Venkateswara Crusher — environmental approval granted, 5 km away
- Rough Stone Quarry Project Belongs to M/s. Jagadeesan Mining — lapsed, 5.5 km away
- Proposed Rough Stone quarry of M/s. Ram Mining — environmental approval granted, 5.5 km away
- PROPOSED ROUGH STONE QUARRY OF M/s. RAM MINING — returned to applicant, 5.5 km away
- Proposed Rough Stone Quarry of M/s. Bagavathi Blue Metals — initial checks, 6.4 km away
- Proposed Rough Stone Quarry of M/s. Bagavathi Blue Metals — cleared for impact study, 6.4 km away
- Black Granite Quarry project — environmental approval granted, 8.1 km away
- Acquiring of Land Situated on the Foothills in Between Semmalai R.F. and… — lapsed, 8.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.