Quick answers
What is this project?
Widening and Strengthening Works on the Existing Road From Mazhavanthangal to Thuthipattu Across Gengavaram R.F is a lapsed road project in Gangavaram R.F., Gingee, Viluppuram, Tamil Nadu. The site covers 2.4 acres.
Who is building it?
The applicant is Highways Construction & Maintenance Gingee Sub-Division.
Has it been approved?
No. The application was lapsed on 3 Oct 2023, so it is no longer under consideration.
Where is it?
In Gangavaram R.F., Gingee, Viluppuram, Tamil Nadu.
How big is it?
It has a stated cost of ₹40 lakh; a site of 2.4 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 7 Oct 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Oct 2023 |
| Application filed | 7 Oct 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Highways Construction & Maintenance Gingee Sub-Division |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Gangavaram R.F. |
| Taluk / tehsil | Gingee |
| District | Viluppuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05803 |
In context
33 applications in Viluppuram since January 2022 are in the same category (Roads & highways): 2 approved, 2 filed or under review, and 29 withdrawn, lapsed or rejected. At 2.4 acres, this one is smaller than 61% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gangavaram R.F., Gingee, Viluppuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening and Strengthening Works on the Existing Road Across Gengavaram R.F — lapsed, 1.7 km away
- Widening and Strengthening Works on the Existing Road From Palavalam Privu to… — lapsed, 3.3 km away
- Widening and Strengthening Works on the Existing Road From Ananthapuram to… — lapsed, 3.3 km away
- Widening and strengthening of Gengavaram Malaiyarasankuppam road across… — lapsed, 3.8 km away
- Bt Road Formation and Maintenance Works on the Road From Adukkam to Thandarai… — lapsed, 4.8 km away
- Bt Road Formation and Maintenance Works From Adukkam to Thandarai Across… — lapsed, 5.3 km away
- Bt Road Formation and Maintenance Works on the Road From Oddampattu to Adukkam… — lapsed, 5.6 km away
- Udaiyanatham Black Granite Quarry — lapsed, 5.8 km away
More from Highways Construction & Maintenance Gingee Sub-Division in Viluppuram
- Widening and Strengthening Works on the Existing Road Across Gengavaram R.F — lapsed
- Widening and Strengthening Works on the Existing Road From Vellamalai Privu to… — lapsed
- Widening and Strengthening Works on the Existing Road From Ananthapuram to… — lapsed
- Widening and Strengthening Works on the Existing Road From Gingee – Villupuram… — lapsed
- Widening and Strengthening Works on the Existing Road From Palavalam Privu to… — lapsed
- Widening and Strengthening Works on the Existing Road From Periyamur to… — lapsed
All 9 Highways Construction & projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.