Quick answers
What is this project?
Laying of underground OFC from Mallapuram to Muthalamparai across Saptur RF and Gandamanur East RF in Srivilliputhur and Megamalai Divisions of SMTR, Madurai is a lapsed building project in Mallapuram, Peraiyur, Madurai, Tamil Nadu. The site covers 0.5 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 24 Apr 2026, so it is no longer under consideration.
Where is it?
In Mallapuram, Peraiyur, Madurai, Tamil Nadu.
How big is it?
It has a stated cost of ₹15 lakh; a site of 0.5 acres and 1,870 m² of forest land.
When was it filed?
The application was filed on 19 Jun 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Apr 2026 |
| Application filed | 19 Jun 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Buildings & townships |
| Applicant | Bharti Airtel Limited |
| Land area | 1,900 m² |
| Forest land | 1,870 m² |
| Project cost | ₹15 lakh |
| Village / locality | Mallapuram |
| Taluk / tehsil | Peraiyur |
| District | Madurai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05814 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 19 Jun 2025 (this page) | Lapsed | 0.5 acres | ₹15 lakh |
| New project filed 18 Feb 2025 | Lapsed | 0.5 acres | ₹15 lakh |
In context
33 applications in Madurai since January 2022 are in the same category (Buildings & townships): 19 approved, 5 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.5 acres, this one is smaller than 97% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mallapuram, Peraiyur, Madurai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of underground OFC from Mallapuram to Muthalamparai across Saptur RF… — lapsed, 0 m away
- Laying of underground OFC from Mallapuram to Muthalamparai across Saptur RF in… — more information requested, 50 m away
- Laying of underground OFC from Mallapuram to Muthalamparai across Saptur RF in… — lapsed, 50 m away
- M/s. Vijayalakshmi Constructions Rough Stone Quarry- Soolapuram — environmental approval granted, 8.4 km away
- Galvalume sheet shed Annadhanakoodam in Sathuragiri Sundharamahalingam Temple… — lapsed, 9 km away
- Steel Bridges in 7 Locations Across River Streams From Dhaniparai to Arulmigu… — more information requested, 9.8 km away
- Formation of Handrails in 5 locations on Dhaniparai pathway to Arulmigu… — more information requested, 10.3 km away
- Formation of approach road and worship area for Arulmigu Sannasi Swamy Temple… — lapsed, 13.6 km away
More from Bharti Airtel Limited in Madurai
- Laying of underground OFC from Mallapuram to Muthalamparai across Saptur RF in… — lapsed
- Laying of underground OFC from Mallapuram to Muthalamparai across Saptur RF in… — more information requested
4 Bharti Airtel (Airtel) projects in Madurai
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.