Quick answers
What is this project?
Strengthening of Palamedu-Vembarali road (MDR 1095) km 5/534 to Km 6/600 including Construction of Culvert at Km 5/10 across Kiluvamalai R.F in Madurai Highways Division, Madurai District is a proposed road project in Kiluvamalai R.F, Madurai North, Madurai, Tamil Nadu. The site covers 1.5 acres.
Who is building it?
The applicant is Highways Construction and Maintenance Vadipatti Sub Division.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kiluvamalai R.F, Madurai North, Madurai, Tamil Nadu.
How big is it?
It has a stated cost of ₹15 lakh; a site of 1.5 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 23 Nov 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 22 Sept 2026 |
| Application filed | 23 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Highways Construction and Maintenance Vadipatti Sub Division |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Kiluvamalai R.F |
| Taluk / tehsil | Madurai North |
| District | Madurai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05937 |
In context
12 applications in Madurai since January 2022 are in the same category (Roads & highways): 1 approved, 3 filed or under review, and 8 withdrawn, lapsed or rejected. At 1.5 acres, this one is larger than 83% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kiluvamalai R.F, Madurai North, Madurai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road Improvement Works on the Road Passing From Palamedu to Vembarali Across… — lapsed, 150 m away
- Road improvement and expansion works on Palamedu – Vembarali Road (MDR 1095)… — lapsed, 300 m away
- Road improvement and BT road formation works from Muduvarpatti to Salvarpatti… — forest land use approved, 5 km away
- Rough Stone Quarry of Thiru.M.Sabarieswar — environmental approval granted, 5.7 km away
- Rough Stone Quarry of Thiru.M.Sabarieswar — environmental approval granted, 5.7 km away
- Gravel Quarry of Thiru.M.Ramalingam — environmental approval granted, 5.7 km away
- Rough Stone Quarry of Thiru.A.Maruthupandian — environmental approval granted, 5.8 km away
- Rough Stone and Gravel Quarry of Thiru. T. Ravichandran — cleared for impact study, 5.8 km away
More from Highways Construction and Maintenance Vadipatti Sub Division in Madurai
- Road Improvement Works on the Road Passing From Palamedu to Vembarali Across… — lapsed
- Road improvement and expansion works on Palamedu – Vembarali Road (MDR 1095)… — lapsed
All 3 Highways Construction and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.