Quick answers
What is Pipeline?
Pipeline is a lapsed water and irrigation project in Mulakkurichchi, Rasipuram, Namakkal, Tamil Nadu. It seeks 0 acres of forest land.
Who is building it?
The applicant is M Palanisamy.
Has it been approved?
No. The application was lapsed on 6 Jul 2026, so it is no longer under consideration.
Where is it?
In Mulakkurichchi, Rasipuram, Namakkal, Tamil Nadu.
How big is it?
It has a stated cost of ₹350 crore and 130 m² of forest land.
When was it filed?
The application was filed on 9 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Jul 2026 |
| Application filed | 9 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | M Palanisamy |
| Forest land | 130 m² |
| Project cost | ₹350 crore |
| Village / locality | Mulakkurichchi |
| Taluk / tehsil | Rasipuram |
| District | Namakkal |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06005 |
In context
6 applications in Namakkal since January 2022 are in the same category (Water & irrigation): 0 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mulakkurichchi, Rasipuram, Namakkal, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of underground underground OFC across Perumalmalai R.F. from… — lapsed, 4 km away
- Dividing Structure Across Palar in the Bailnadu Reserve Forest Near… — lapsed, 9 km away
- Laying of Arial OFC along the road side from Gundur Nadu to Alathur Nadu… — lapsed, 9.1 km away
- Laying of Arial OFC along the road side from Gundur Nadu to Gunduni Nadu… — lapsed, 9.6 km away
- Laying of Ug Ofc Along Road Side From Ombadapalikadu to Urambu Villages Across… — lapsed, 9.7 km away
- BSNL 4G Mobile tower — under forest review, 10.5 km away
- Installation of 4G Mobile tower at Namakkal District and OFC laying-4G… — lapsed, 10.5 km away
- Laying of Arial Ofc Along the Road Side From Sendamangalam to Kollihills… — lapsed, 12.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.