Project details
| Status | Forest land use approved |
|---|---|
| Status since | 30 Apr 2025 |
| Application filed | 25 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1,800 m² |
| Forest land | 1,850 m² |
| Project cost | ₹10 lakh |
| Village / locality | Mordana |
| Taluk / tehsil | Pernambut |
| District | Vellore |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06076 |
In context
10 applications in Vellore since January 2022 are in the same category (Telecom): 1 approved, 1 filed or under review, and 8 withdrawn, lapsed or rejected. At 0.4 acres, this one is smaller than 60% of them.
Where it is
Mordana, Pernambut, Vellore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of aerial OFC along the road side across Mordana Extn. R.F.,… — lapsed, 5.5 km away
- Gravel Quarry of Thiru.Michael Antony — lapsed, 6.2 km away
- Sempalli Rough Stone and Gravel Quarry Lease — environmental approval granted, 7.5 km away
- Proposed Rough Stone Quarry of Thiru.J. Nareshkrishna — environmental approval granted, 13.8 km away
- Proposed Rough Stone Quarry of Thiru.J. Nareshkrishna — cleared for impact study, 13.8 km away
- Rough stone Quarry of Tvl.Sri Sai Constructions, Thiru.Gowthamkrishna… — environmental approval granted, 14 km away
- Rough stone Quarry of Tvl.Sri Sai Constructions, Thiru.Gowthamkrishna… — cleared for impact study, 14 km away
- Rough Stone Quarry of Thiru.R.Sathish — environmental approval granted, 14.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.