Quick answers
What is this project?
Formation of Road to Shri Periyaveettu Amman Kovil Road in Nedunkunam Reserve Forest is a lapsed road project in Nedunkunam R F, Chetpet, Tiruvannamalai, Tamil Nadu. The site covers 2.1 acres.
Who is building it?
The applicant is Krishnan Manickam.
Has it been approved?
No. The application was lapsed on 15 Feb 2024, so it is no longer under consideration.
Where is it?
In Nedunkunam R F, Chetpet, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹50 lakh; a site of 2.1 acres and 2.1 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 16 Oct 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Feb 2024 |
| Application filed | 16 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Krishnan Manickam |
| Land area | 2.1 acres (0.9 ha) |
| Forest land | 2.1 acres (0.9 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Nedunkunam R F |
| Taluk / tehsil | Chetpet |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06284 |
In context
49 applications in Tiruvannamalai since January 2022 are in the same category (Roads & highways): 7 approved, 4 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2.3 years from filing to approval. At 2.1 acres, this one is smaller than 53% of them.
Where it is
Nedunkunam R F, Chetpet, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Aerial Ofc Along the Road Side From Thavani to Namathode Across… — lapsed, 7.1 km away
- Proposed Rough Stone Quarry of Thiru. A.R. Govindan — environmental approval granted, 7.8 km away
- Proposed Rough Stone Quarry of Thiru. A.R. Govindan — cleared for impact study, 7.8 km away
- Vishnusurya Projects and Infra Ltd., Rough and Gravel Quarry Project, Extent:… — environmental approval granted, 9.1 km away
- Vishnusurya Projects and Infra Ltd., Rough and Gravel Quarry Project, Extent:… — cleared for impact study, 9.1 km away
- Rough Stone and Gravel Quarry Project Belongs to M/s. VSK Logistics. — environmental approval granted, 9.2 km away
- Rough Stone and Gravel Quarry of Thiru. T. Karthi — initial checks, 10.3 km away
- Tvl. Vishnusurya Project and Infra Limited, Rough Stone and Gravel Quarry,… — environmental approval granted, 10.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.