Quick answers
What is this project?
LAYING OF LT DISTRIBUTION LINE BY TANGEDCO TO 1 No. DOMESTIC SERVICE CONNECTION TO THIRU. S. ELUMALAI, S/o SUBRAMANI, SHOLANKUPPAM VILLAGE OF SURVEY No. 708/2 OF VEERALUR VILLAGE, KALASAPAKKAM TALUK, TIRUVANNAMALAI DISTRICT IN MULAKKADU RESERVED FOREST is a lapsed building project in Malakkdu Rf, Jamunamarathoor, Tiruvannamalai, Tamil Nadu. The site covers 0.3 acres.
Who is building it?
The applicant is S Elumalai.
Has it been approved?
No. The application was lapsed on 1 Oct 2024, so it is no longer under consideration.
Where is it?
In Malakkdu Rf, Jamunamarathoor, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹2 lakh; a site of 0.3 acres and 1,100 m² of forest land.
When was it filed?
The application was filed on 2 Jul 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Oct 2024 |
| Application filed | 2 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | S Elumalai |
| Land area | 1,100 m² |
| Forest land | 1,100 m² |
| Project cost | ₹2 lakh |
| Village / locality | Malakkdu Rf |
| Taluk / tehsil | Jamunamarathoor |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06293 |
In context
13 applications in Tiruvannamalai since January 2022 are in the same category (Buildings & townships): 7 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.3 acres, this one is smaller than 92% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malakkdu Rf, Jamunamarathoor, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bt Road Formation Works on Existing Road From Palavari to Erumaiyanur Villages… — lapsed, 4.2 km away
- Bt Road Formation Works on Existing Road Between Attiyanur to Nachamalai… — lapsed, 6.4 km away
- Laying of Aerial/UG OFC along road side across RF/RL — more information requested, 7.2 km away
- Bt Road Formation Works on Existing Road Between Nallapattu to Pathri Villages… — lapsed, 7.3 km away
- Laying of Aerial OFC along the road side across the Thenmalai R.F. (Javadi… — lapsed, 8.4 km away
- Improvements to Foot Path and Pilgrims Waiting Shed, Over Head Water Tanks,… — lapsed, 8.5 km away
- Laying of Aerial/UG OFC along road side across RF/RL by TANFINET — more information requested, 9.1 km away
- Widening and Improvements From Single Lane to Intermediate Lane for the Length… — lapsed, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.