Quick answers
What is this project?
Widening and Improvements From Single Lane to Intermediate Lane for the Length of 38.920 Km From Jamunamarathur to Amirthi Road is a proposed road project in Jamanamarattur, Jamunamarathoor, Tiruvannamalai, Tamil Nadu. The site covers 97.4 acres.
Who is building it?
The applicant is De H Tiruvannamalai.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Jamanamarattur, Jamunamarathoor, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹103 crore; a site of 97.4 acres and 62 acres (25.1 ha) of forest land.
When was it filed?
The application was filed on 1 Jul 2024.
Project details
| Official title | Widening and Improvements From Single Lane to Intermediate Lane for the Length of 38.920 Km From Jamunamarathur to Amirthi Road in Tiruvannamalai District |
|---|---|
| Status | More information requested |
| Status since | 21 Nov 2026 |
| Application filed | 1 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | De H Tiruvannamalai |
| Land area | 97.4 acres (39.4 ha) |
| Forest land | 62 acres (25.1 ha) |
| Project cost | ₹103 crore |
| Village / locality | Jamanamarattur |
| Taluk / tehsil | Jamunamarathoor |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06339 |
In context
49 applications in Tiruvannamalai since January 2022 are in the same category (Roads & highways): 7 approved, 4 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2.3 years from filing to approval. At 97.4 acres, this one is larger than 98% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamanamarattur, Jamunamarathoor, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bt Road Formation Works on Existing Road Between Nagalur to Melmurungaimandhai… — lapsed, 3.9 km away
- Bt Road Formation Works on Existing Road Between Nagalur to Kilmurungaimandhai… — lapsed, 4.2 km away
- Laying of Aerial OFC along the road side across the Puttur R.F. (Javadi Hills) — lapsed, 6 km away
- Laying of Aerial Ofc Along the Road Side Across the Puttur R.F. (Javadi Hills) — lapsed, 6 km away
- BT road formation works on existing Kanamalai road between Pallavanpatti to… — lapsed, 7.2 km away
- BT road formation works on existing Neerthombai road between Thurinjipuram to… — lapsed, 7.3 km away
- BT road formation works on Kottaimalai road upto Elanthampattu village across… — lapsed, 7.4 km away
- BT road formation works on existing Palamathi road between Melshenbagathoppu… — lapsed, 8.8 km away
More from De H Tiruvannamalai in Tiruvannamalai
- Widening and Improvements from Single Lane to Intermediate Lane for the length… — forest land use approved
- Widening and Improvements from Single Lane to Intermediate Lane in Km 0/0 -… — not approved
- Widening and Improvements from Single Lane to Intermediate Lane for the length… — lapsed
- Widening and Improvements From Single Lane to Intermediate Lane for the Length… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.