Project details
| Status | Initial checks |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 23 Nov 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | P2p Networks Private Limited |
| Land area | 800 m² |
| Forest land | 840 m² |
| Project cost | ₹5 lakh |
| Village / locality | Nemalur |
| Taluk / tehsil | Gummidipoondi |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06407 |
In context
14 applications in Thiruvallur since January 2022 are in the same category (Roads & highways): 2 approved, 5 filed or under review, and 7 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 86% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nemalur, Gummidipoondi, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Formation of approach road to Patta field inside Reserve Land from Arani Loop… — lapsed, 1.9 km away
- Expansion of Billets Manufacturing From 26,400 Tons/Annum To 1,57,680… — cleared for impact study, 3.9 km away
- Expansion of Existing Billets Manufacturing Facility from 26,400 Tons/Annum to… — not approved, 3.9 km away
- Expansion of Billets Manufacturing From 26,400 Tons/Annum To 1,57,680… — withdrawn, 3.9 km away
- Expansion of Existing Billets Manufacturing Facility from 26,400 Tons/Annum to… — more information requested, 3.9 km away
- Industrial Park with Industrial Housing Facility at Soorapoondi and… — environmental approval granted, 3.9 km away
- Industrial Park With Industrial Housing Facility at Soorapoondi and… — more information requested, 3.9 km away
- Proposed Expansion of Steel Melting Shop & Steel Rolling Mill in the existing… — environmental approval granted, 4.3 km away
All 11 P2p Networks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.