Quick answers
What is this project?
Diversion of Forest Land for Water Supply From Sarkar Manapalli Village to Via Around the Madakasampatty Villages and Thottypatty Villages is a lapsed pipeline project in Tottiyapatti, Namakkal, Tamil Nadu. The site covers 0.2 acres.
Who is building it?
The applicant is Arulmugu Raja Vinayagar Small Farmers Lift Irrigation Society.
Has it been approved?
No. The application was lapsed on 25 Sept 2025, so it is no longer under consideration.
Where is it?
In Tottiyapatti, Namakkal, Tamil Nadu.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.2 acres and 1,000 m² of forest land.
When was it filed?
The application was filed on 16 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Sept 2025 |
| Application filed | 16 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Arulmugu Raja Vinayagar Small Farmers Lift Irrigation Society |
| Land area | 1,000 m² |
| Forest land | 1,000 m² |
| Project cost | ₹60 lakh |
| Village / locality | Tottiyapatti |
| Taluk / tehsil | Namakkal |
| District | Namakkal |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06411 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tottiyapatti, Namakkal, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone Quarry of Tmt.R.Papitha — environmental approval granted, 2.5 km away
- Roughstone & Gravel Quarry of Tmt. Saraswathi — cleared for impact study, 2.6 km away
- Roughstone & Gravel Quarry of Tmt. Saraswathi — withdrawn, 2.6 km away
- Roughstone & Gravel Quarry of Thiru. Vasanth — cleared for impact study, 2.7 km away
- Rough Stone and Gravel Quarry Project Belongs to Thiru. R. Krishnamoorthy — under environmental review, 8.3 km away
- INDUSTRIAL PARK OVER AN EXTENT OF 325.215 HECTARES (803.281 ACRES) AT… — cleared for impact study, 9.6 km away
- KONDAMANAICKENPATTY VILLAGE, Rough Stone and Gravel Quarry Project Belongs to… — environmental approval granted, 11.7 km away
- Rough Stone Quarry of Thiru.S.Subash — environmental approval granted, 11.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.