Project details
| Official title | Construction of High level Bridge across Moola Vaigai River connecting Devadhanapatti - Varusanadu Road and Dharmarajapuram - Ottani Union Road |
|---|---|
| Status | Under wildlife review |
| Status since | 29 Dec 2023 |
| Application filed | 29 Dec 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Nabard and Rural Roads (H) Madurai Division |
| Land area | 1,500 m² |
| Project cost | ₹8 crore |
| Village / locality | Mayiladumaparai |
| Taluk / tehsil | Andipatti |
| District | Theni |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06501 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Aug 2024 | Lapsed | 0.4 acres | ₹8 crore |
| New project filed 29 Dec 2023 (this page) | Under wildlife review | 0.4 acres | ₹8 crore |
In context
20 applications in Theni since January 2022 are in the same category (Roads & highways): 0 approved, 4 filed or under review, and 16 withdrawn, lapsed or rejected. At 0.4 acres, this one is smaller than 71% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mayiladumaparai, Andipatti, Theni, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- High level Bridge across Moola Vaigai River connecting Devadhanapatti -… — lapsed, 0 m away
- Strengthening the Mayiladumparai to Ponnanpadugai Road km 0/0 - 5/0 (apply for… — lapsed, 3 km away
- Keelapoosanuthu Road to Kallurundasunai at (0/0-2/0) Rural Development Theni — lapsed, 3.7 km away
- Proposed road strengthening works on the road from Sengulam vilakku to… — lapsed, 4.3 km away
- Proposed road strengthening works on the road from Sengulam vilakku to… — under wildlife review, 4.3 km away
- Road strengthening works on the road from Sengulam vilakku to Moolakadai… — lapsed, 4.3 km away
- Road upgradation works in Varusanadu - (via) Thummagundu - Valiparai Road (0/0… — under wildlife review, 4.9 km away
- Laying of underground OFC along Gandamanur – Mallapuram road via.… — more information requested, 5.8 km away
More from Nabard and Rural Roads (H) Madurai Division in Theni
- Road upgradation works in Varusanadu - (via) Thummagundu - Valiparai Road (0/0… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.