Project details
| Status | Under wildlife review |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 22 Oct 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rathinavel |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Sampalli |
| Taluk / tehsil | Mettur |
| District | Salem |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06709 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Oct 2026 (this page) | Under wildlife review | 2.5 acres | ₹55 lakh |
| New project filed 1 Sept 2026 | More information requested | 2.5 acres | ₹55 lakh |
In context
13 applications in Salem since January 2022 are in the same category (Buildings & townships): 5 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected. At 2.5 acres, this one is smaller than 77% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sampalli, Mettur, Salem, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sampalli Village Rough Stone Mining Project — more information requested, 0 m away
- R. Ramakrishnan, Rough Stone and Gravel Quarry Project, Extent of 1.00.2Ha,… — not approved, 400 m away
- Thiru S.Subramani - Rough stone quarry from over an Extent of 1.00.0Ha in… — lapsed, 650 m away
- Moolakkadu Village Rough Stone and Gravel Quarry Lease — not approved, 1.7 km away
- M.Arumugam, Moolakkadu Rough stone Quarry Project over an Extent of 1.50.0Ha… — environmental approval granted, 1.9 km away
- Yellikaradu Black Granite Quarry 16.72.0Ha — environmental approval granted, 2.4 km away
- Tmt. P. Kalaiselvi, Rough stone and Gravel Quarry Project at over an Extent of… — lapsed, 2.6 km away
- Greenko TN-11 Off-Stream Closed Loop Pumped Storage Project — cleared for impact study, 2.7 km away