Project details
| Status | More information requested |
|---|---|
| Status since | 3 Sept 2026 |
| Application filed | 3 Sept 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Rural Development |
| Land area | 3,500 m² |
| Project cost | ₹1.3 crore |
| Village / locality | Kottadai |
| Taluk / tehsil | Thalavadi |
| District | Erode |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06752 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Oct 2026 | More information requested | 0.9 acres | ₹1.3 crore |
| New project filed 3 Sept 2026 (this page) | More information requested | 0.9 acres | ₹1.3 crore |
| New project filed 2 Jul 2026 | Lapsed | 0.9 acres | ₹1.3 crore |
In context
25 applications in Erode since January 2022 are in the same category (Roads & highways): 0 approved, 14 filed or under review, and 11 withdrawn, lapsed or rejected. At 0.9 acres, this one is smaller than 90% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kottadai, Thalavadi, Erode, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing Cement Concrete Pavement From Km 7/2 of Kottadai Main Road to… — more information requested, 0 m away
- Providing Cement Concrete Pavement From Km 7/2 of Kottadai Main Road to… — lapsed, 0 m away
- Upgradation of Bitumenous Surface From Kotadai Main Road to Pudhukadu Road — lapsed, 0 m away
- Upgradation of Bituminous surface from Kollegal Asanur Road – Gethesal road at… — under wildlife review, 7.6 km away
- Upgradation of Bituminous surface from Kollegal Asanur Road – Gethesal road at… — lapsed, 7.8 km away
- Construction of hard Bed from Kollegal Hasanur road to Gethesal Road — lapsed, 7.8 km away
- Upgradation of Bituminous Surface From Thalamalai – Thalavadi Road to… — more information requested, 9 km away
- Upgradation of Bituminous Surface From Thalamalai – Thalavadi Road to… — more information requested, 9.8 km away
More from Rural Development in Erode
- Upgradation of Bitumenous Surface From Kotadai Main Road to Pudhukadu Road — lapsed
- Construction of hard Bed from Kollegal Hasanur road to Gethesal Road — lapsed
- Requisition of Forest Land for Chennimalai Panchayat Union Office — lapsed
- Upgradation the Road From Burgur Road to Sundapur Road Km(0/0-3/0) — more information requested
- Upgradation the Road From Thamaraikari - Kongadai Road to Dholli Habitation — more information requested
- Upgradation of Bituminous surface from Kollegal Asanur Road – Gethesal road at… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.