Quick answers
What is this project?
Proposed Mangrove Conservation Centre at Pitchavaram Reserve Forest is a lapsed project in Thandavarayancholanganpettai, Chidambaram, Cuddalore, Tamil Nadu. The site covers 6.2 acres.
Who is building it?
The applicant is District Forest Officer Cuddalore.
Has it been approved?
No. The application was lapsed on 5 Mar 2026, so it is no longer under consideration.
Where is it?
In Thandavarayancholanganpettai, Chidambaram, Cuddalore, Tamil Nadu.
How big is it?
It has a stated cost of ₹26.5 crore and a site of 6.2 acres.
When was it filed?
The application was filed on 27 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Mar 2026 |
| Application filed | 27 Nov 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | District Forest Officer Cuddalore |
| Land area | 6.2 acres (2.5 ha) |
| Project cost | ₹26.5 crore |
| Village / locality | Thandavarayancholanganpettai |
| Taluk / tehsil | Chidambaram |
| District | Cuddalore |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06953 |
In context
10 applications in Cuddalore since January 2022 are in the same category (Other): 3 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thandavarayancholanganpettai, Chidambaram, Cuddalore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Upgradation of Pichavaram as Major Tourist Destination at S.F. No. 338/1 &… — coastal clearance granted, 500 m away
- PROPOSED DEVELOPMENT DRILLING of 4 WELLS IN PY-1 OFFSHORE OIL & GAS BLOCK — under coastal review, 5.5 km away
- PROPOSED DEVELOPMENT DRILLING of 4 WELLS IN PY-1 OFFSHORE OIL & GAS BLOCK — cleared for impact study, 5.5 km away
- Environmental & CRZ Clearance for the Reduction of Captive Port from 15 MTPA… — lapsed, 9.6 km away
- EC & CRZ Clearance for revised capacity from 15 MMTPA to 5 MMTPA Captive Port… — environmental approval granted, 9.6 km away
- EC & CRZ Clearance for revised capacity from 15 MMTPA to 5 MMTPA Captive Port… — cleared for impact study, 9.6 km away
- Irrigation Project By Construction Of Barrage Across Coleroon River In Adhanur… — lapsed, 9.8 km away
- Drilling of One Infill Development Well in Offshore Block of Cauvery Basin by… — environmental approval granted, 11.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.