Quick answers
What is Proposed Beach Resort?
Proposed Beach Resort is an approved tourism project in Kunimedu, Marakanam, Viluppuram, Tamil Nadu. The site covers 9.5 acres.
Who is building it?
The applicant is Srisun Resorts Private Limited.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 27 Apr 2026), as of 27 Nov 2026.
Where is it?
In Kunimedu, Marakanam, Viluppuram, Tamil Nadu.
How big is it?
It has a stated cost of ₹25.6 crore and a site of 9.5 acres.
When was it filed?
The application was filed on 13 Mar 2025.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 27 Apr 2026 |
| Application filed | 13 Mar 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Tourism & hotels |
| Applicant | Srisun Resorts Private Limited |
| Land area | 9.5 acres (3.9 ha) |
| Project cost | ₹25.6 crore |
| Village / locality | Kunimedu |
| Taluk / tehsil | Marakanam |
| District | Viluppuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06962 |
In context
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kunimedu, Marakanam, Viluppuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bt Road Formation and Maintenance Works on the Road From Koonimedu Kuppam to… — lapsed, 800 m away
- Discarded fish net collection centre by the Tamil Nadu Pollution Control Board… — under coastal review, 1.6 km away
- BT Road formation and maintenance works on Chettinagar Vallathammankovil road… — lapsed, 2.8 km away
- 440 houses at Kiputhupattu Srilankan Refugees camp — recommended by coastal authority, 3.4 km away
- Strengthening of Right Side Bund of Existing Kazhuveli Tank — more information requested, 3.7 km away
- Proposed Construction of Resort Building by Ms. Ramani — coastal clearance granted, 4 km away
- Proposed Construction of Resort Building by Mr. Baskaran — coastal clearance granted, 4.1 km away
- Desilting and Strengthening of Left Side & Right Side Bund of Existing… — decision issued, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.