One of 2 filings for this project. The project's main page, with every filing and where each stands: Kolathur Village Rough Stone and Gravel Mining Lease
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 5 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Swaminathan Vijayakumar |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹78 lakh |
| Village / locality | Kulathur (Ct) |
| Taluk / tehsil | Srirangam |
| District | Tiruchirappalli |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-07037 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Nov 2026 (this page) | Under environmental review | 9.9 acres | ₹78 lakh |
| Early planning filed 29 Jul 2025 | Cleared for impact study | 9.9 acres | ₹78 lakh |
In context
87 applications in Tiruchirappalli since January 2022 are in the same category (Mining): 72 approved, 8 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 77% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 16.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Kulathur (Ct), Srirangam, Tiruchirappalli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kolathur Village Rough Stone and Gravel Mining Lease — cleared for impact study, 0 m away
- Kulathur Village Rough Stone and Gravel Mining Lease — environmental approval granted, 250 m away
- Samudram Village Rough Stone and Gravel Mining Project — under environmental review, 3.7 km away
- Proposed Rough Stone and Gravel Quarry of Thiru.A.Thirumurugan — initial checks, 8.6 km away
- Industrial Unit for Manufacture of Pre-engineered Steel Buildings and… — environmental approval granted, 9.6 km away
- Proposed Manufacturing of Inorganic & Complex Inorganic Colored Pigments by… — under environmental review, 10.2 km away
- Proposed Manufacturing of Inorganic & Complex Inorganic Colored Pigments by… — cleared for impact study, 10.2 km away
- Proposed 200 KLPD Grain Based Distillery Unit — environmental approval granted, 10.8 km away
More from Swaminathan Vijayakumar in Tiruchirappalli
- Kulathur Village Rough Stone and Gravel Mining Lease — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.