Quick answers
What is this project?
Ichipatti Village Rough Stone and Gravel Quarry Project Belongs to Thiru. M. Lakshmanasamy is a proposed mining project in Ichchippatti, Palladam, Tiruppur, Tamil Nadu. The site covers 3 acres.
Who is building it?
The applicant is M Lakshmanasamy.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Ichchippatti, Palladam, Tiruppur, Tamil Nadu.
How big is it?
It has a site of 3 acres.
When was it filed?
The application was filed on 6 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 6 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | M Lakshmanasamy |
| Land area | 3 acres (1.2 ha) |
| Village / locality | Ichchippatti |
| Taluk / tehsil | Palladam |
| District | Tiruppur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-07045 |
In context
205 applications in Tiruppur since January 2022 are in the same category (Mining): 147 approved, 41 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3 acres, this one is smaller than 85% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 15.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 34 mining leases have applied within 5 km.
Where it is
Ichchippatti, Palladam, Tiruppur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ichipatti Village Rough Stone and Gravel Quarry Project Belongs to Thiru. V.… — initial checks, 200 m away
- S. Balakumar Rough Stone and Gravel Quarry Extent: 1.15.5ha S.F.No. 197/1,… — environmental approval granted, 300 m away
- T. Naveen Kiran, Rough Stone and Gravel Quarry, Extent: 2.83.4ha, S.F.No.… — environmental approval granted, 350 m away
- T. Naveen Kiran, Rough Stone and Gravel Quarry, Extent: 2.83.4ha, S.F.No.… — cleared for impact study, 350 m away
- S.A.Ramachandran Rough Stone and Gravel Quarry — environmental approval granted, 750 m away
- S.A.Ramachandran Rough Stone and Gravel Quarry — cleared for impact study, 750 m away
- Rough Stone and Gravel Quarry Project Belongs to M/s. Shri Praveen and… — cleared for impact study, 2.9 km away
- Rough Stone and Gravel Quarry Project Belongs to M/s. Shri Praveen and… — environmental approval granted, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.