One of 2 filings for this project. The project's main page, with every filing and where each stands: Delta Electronics India – KG factory - Plot 1 - Phase I, II & Expansion Phase III
Project details
| Status | Under environmental review |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 16 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Delta Electronics India Private Limited |
| Land area | 58.1 acres (23.5 ha) |
| Project cost | ₹2,354.7 crore |
| Village / locality | Kurubarapalli |
| Taluk / tehsil | Krishnagiri |
| District | Krishnagiri |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-07100 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 16 Nov 2026 (this page) | Under environmental review | 58.1 acres | ₹2,354.7 crore |
| Early planning filed 7 Aug 2026 | Cleared for impact study | 58.1 acres | ₹2,354.7 crore |
In context
78 applications in Krishnagiri since January 2022 are in the same category (Buildings & townships): 53 approved, 18 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 58.1 acres, this one is larger than 62% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kurubarapalli, Krishnagiri, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Delta Electronics India – KG factory - Plot 1 - Phase I, II & Expansion Phase… — cleared for impact study, 0 m away
- Dormitory Buildings of the Industrial Units for the Manufacture of Electronic… — environmental approval granted, 400 m away
- Laying of Ug Ofc Along the Road Side Between Kurubarapalli to Melumalai… — lapsed, 1.1 km away
- Providing BT road from NH7 to Keel Bikkanapalli (Via) Bikkanapalli Km 0/0-0/600 — lapsed, 2 km away
- Amendment in construction of Industrial Sheds — returned to applicant, 4.9 km away
- Expansion in Construction of Industrial Sheds — environmental approval granted, 4.9 km away
- Chennasandiram Village Rough Stone Quarry Lease — environmental approval granted, 6.3 km away
- M/s. Saraa Granites, Black Granite Quarry over an extent of 1.98.0 Ha in… — environmental approval granted, 6.4 km away
More from Delta Electronics India Private Limited in Krishnagiri
- Dormitory Buildings of the Industrial Units for the Manufacture of Electronic… — environmental approval granted
All 3 Delta Electronics projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.