Quick answers
What is Mining project by M/s Animul Haque Sand?
This proposed mining project by M/s Animul Haque Sand is in Barapathar, Sonamura, Sipahijala, Tripura. The site covers 2.3 acres.
Who is building it?
The applicant is Animul Haque.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Barapathar, Sonamura, Sipahijala, Tripura.
How big is it?
It has a stated cost of ₹10 lakh and a site of 2.3 acres.
When was it filed?
The application was filed on 19 Feb 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 9 Jul 2026 |
| Application filed | 19 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Animul Haque |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Barapathar |
| Taluk / tehsil | Sonamura |
| District | Sipahijala |
| State | Tripura |
| Location from | Site boundary on record |
| Our reference | WID-TR-00163 |
In context
23 applications in Sipahijala since January 2022 are in the same category (Mining): 0 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. At 2.3 acres, this one is smaller than 65% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 5.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Barapathar, Sonamura, Sipahijala, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Abdul Ali Sand, Plot No. 4(P), Sand Mining — initial checks, 50 m away
- Bejimara Sand Block Mine — initial checks, 400 m away
- M/s Mijan Sand, Sand Mining Project, Plot No.- 4(P), Stock Plot No.- 4386, 4387 — initial checks, 1.4 km away
- Drilling of Exploratory Locations SNAA and SNAB — initial checks, 2.1 km away
- Exploratory Drilling of Locations SNAA and SNAB — withdrawn, 2.1 km away
- Drilling of Exploratory Location SNAA — initial checks, 2.4 km away
- Melaghar Sand Block — initial checks, 2.7 km away
- Mining project by M/s Hossain Sand, — initial checks, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.