Project details
| Official title | Proposal for Upgradation of road from Chawmanu Road Block to NH-08 via Baba Longtorai Road (Package No:- TR-04-01P3), (Length-12.877 km), (Route No:- T22) under Ambassa Block/Dhalai District |
|---|---|
| Status | More information requested |
| Status since | 20 Aug 2026 |
| Application filed | 2 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | The Executive Engineer, Ambassa Division, Public Works Department (PMGSY), Govt. of Tripura |
| Land area | 26.2 acres (10.6 ha) |
| Forest land | 19.2 acres (7.8 ha) |
| Project cost | ₹10.8 crore |
| Village / locality | Joychandrapara |
| Taluk / tehsil | Longtharai Valley |
| District | Dhalai |
| State | Tripura |
| Location from | Site area on record |
| Our reference | WID-TR-00172 |
In context
21 applications in Dhalai since January 2022 are in the same category (Roads & highways): 1 approved, 15 filed or under review, and 5 withdrawn, lapsed or rejected. At 26.2 acres, this one is larger than 71% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Joychandrapara, Longtharai Valley, Dhalai, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Up gradation of road from Chawmanu Road Block to NH-08 via Baba Longtorai Road… — lapsed, 900 m away
- Diversion of Forest Land for the work of Improvement/ Strengthening of road… — under forest review, 3.6 km away
- Area 2: Regional Long Offset 2D Lines, Tripura Seismic Data Acquisition — forest land use approved, 5.8 km away
- Diversion of forest land for the construction of T-23 Chawmanu-Gobindabari… — lapsed, 7.5 km away
- Diversion of Forest Land for the work of T23 - Chawmanu - Gobindabari road (5… — more information requested, 7.5 km away
- "diversion of Forest Land for the Construction of Road From Chayakumar… — lapsed, 8 km away
- "Construction of approach road including Rail way Over Bridge (ROB no. 283.{ &… — lapsed, 8.7 km away
- 2D seismic survey in the Deo, Manuchhailengta, Longtarai, Ujan Machhmara… — lapsed, 9.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.