One of 2 filings for this project. The project's main page, with every filing and where each stands: Dhunga Soapstone Mining Project
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Nov 2022 |
| Application filed | 8 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Anand Ballabh |
| Land area | 19.7 acres (8 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Dhunga |
| Taluk / tehsil | Bageshwar |
| District | Bageshwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00002 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Feb 2024 | Environmental approval granted | 19.7 acres | ₹45 lakh |
| Early planning filed 8 Nov 2022 (this page) | Cleared for impact study | 19.7 acres | ₹45 lakh |
In context
144 applications in Bageshwar since January 2022 are in the same category (Mining): 125 approved, 6 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.7 acres, this one is larger than 72% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 76.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 16 mining leases have applied within 5 km.
Where it is
Dhunga, Bageshwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dhunga Soapstone Mining Project — environmental approval granted, 0 m away
- Dhunga Patli Soapstone Mine — initial checks, 400 m away
- Project: Dhunga (Mitardhai) Soapstone Mining Project, Village: Dhunga… — environmental approval granted, 450 m away
- Project: Dhunga (Mitardhai) Soapstone Mining Project, Village: Dhunga… — cleared for impact study, 450 m away
- Construction of Naugaon-Harumandir to Matiyoli MR — lapsed, 1.9 km away
- Road From Naugaon-Harumandir Motor Road to Matiyoli — more information requested, 2 km away
- Proposed Soapstone mining project (Mining lease Area 3.909 Ha) by Shri… — environmental approval granted, 2.3 km away
- Nayal Suneri Soapstone Mining Project — environmental approval granted, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.