Quick answers
What is this project?
Environmental Clearance for Proposed Industrial Packaging Plastic & EPS (Thermocol) Waste Recycling Facility M/s Sai Enterprises at Plot No. 0, Akbar Colony, Selaqui, Tehsil – Vikasnagar, District – Dehradun, Uttarakhand is an approved building project in Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The site covers 0.1 acres.
Who is building it?
The applicant is Rajesh Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Feb 2023), as of 27 Nov 2026.
Where is it?
In Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹30 lakh and a site of 0.1 acres.
When was it filed?
The application was filed on 16 Feb 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Feb 2023 |
| Application filed | 16 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rajesh Kumar |
| Land area | 600 m² |
| Project cost | ₹30 lakh |
| Village / locality | Central Hop Town |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00065 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 94% of them.
84 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mancare Laboratories Pvt. Ltd. (Unit – 3) — environmental approval granted, 150 m away
- "Proposed Central Hope Town Sand, Bajri and Boulders Mining in Swarna River… — environmental approval granted, 200 m away
- "Proposed Central Hope Town Sand, Bajri and Boulders Mining in Swarna River… — cleared for impact study, 200 m away
- Industrial project by Uthika Laboratories Private Limited — environmental approval granted, 250 m away
- Beyond Life Line — environmental approval granted, 300 m away
- Environmental Clearance for Proposed Pharmaceutical Formulation Unit by M/s… — environmental approval granted, 350 m away
- East African (India) Overseas — environmental approval granted, 400 m away
- Industrial project by Suncare Formulations Private Limited — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.