What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Dehradun, Uttarakhand

Environmental Clearance for Installation of DG Set in LED Bulbs Manufacturing Unit by M/s Dixon Technologies Solutions Private Limited

Environmental Clearance for Installation of DG Set in LED Bulbs Manufacturing Unit by M/s Dixon Technologies Solutions Private Limited is an approved building project in Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The site covers 1.5 acres. Its stated project cost is ₹46.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Jun 2023).

See it on the live map All projects in Dehradun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Installation of DG Set in LED Bulbs Manufacturing Unit by M/s Dixon Technologies Solutions Private Limited is an approved building project in Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The site covers 1.5 acres.

Who is building it?

The applicant is Dixon Technologies Solutions Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 1 Jun 2023), as of 27 Nov 2026.

Where is it?

In Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand.

How big is it?

It has a stated cost of ₹46.3 crore and a site of 1.5 acres.

When was it filed?

The application was filed on 1 Jun 2023.

Project details

StatusEnvironmental approval granted
Status since1 Jun 2023
Application filed1 Jun 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantDixon Technologies Solutions Private Limited
Land area1.5 acres (0.6 ha)
Project cost₹46.3 crore
Village / localityCentral Hop Town
Taluk / tehsilVikas Nagar
DistrictDehradun
StateUttarakhand
Location fromSite area on record
Our referenceWID-UK-00096

In context

165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.5 acres, this one is smaller than 59% of them.

85 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.