Environmental approval grantedBuildings & townships · Dehradun, Uttarakhand

Environmental Clearance for Proposed Enhancement in Production Capacity of Manufacture of Flip Flop i.e Slippers, Sandals and Parts thereof in the existing Complex

Environmental Clearance for Proposed Enhancement in Production Capacity of Manufacture of Flip Flop i.e Slippers, Sandals and Parts thereof in the existing Complex is an approved building project in Majri Grant, Rishikesh, Dehradun, Uttarakhand. The site covers 0.9 acres. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 25 Apr 2023).

See it on the live map All projects in Dehradun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Proposed Enhancement in Production Capacity of Manufacture of Flip Flop i.e Slippers, Sandals and Parts thereof in the existing Complex is an approved building project in Majri Grant, Rishikesh, Dehradun, Uttarakhand. The site covers 0.9 acres.

Who is building it?

The applicant is Sol Tec.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 25 Apr 2023), as of 27 Nov 2026.

Where is it?

In Majri Grant, Rishikesh, Dehradun, Uttarakhand.

How big is it?

It has a stated cost of ₹1.3 crore and a site of 0.9 acres.

When was it filed?

The application was filed on 25 Apr 2023.

Project details

StatusEnvironmental approval granted
Status since25 Apr 2023
Application filed25 Apr 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantSol Tec
Land area3,600 m²
Project cost₹1.3 crore
Village / localityMajri Grant
Taluk / tehsilRishikesh
DistrictDehradun
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00099

In context

165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.9 acres, this one is smaller than 70% of them.

37 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Majri Grant, Rishikesh, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sol Tec in Dehradun

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.