Quick answers
What is this project?
Proposed manufacturing unit of Synthetic Organic Chemicals of 400 TPD production capacity at Plot No. F-17 To F-20 at Industrial Area Bazpur Site- I, Tehsil- Bazpur, District- Udham Singh Nagar, Uttarakhandby M/s Flymore Constructions Pvt. Ltd is a proposed industrial project in Bazpur, Bajpur, Udham Singh Nagar, Uttarakhand. The site covers 0.5 acres.
Who is building it?
The applicant is Flymore Constructions Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Sept 2023), as of 27 Nov 2026.
Where is it?
In Bazpur, Bajpur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹10 crore and a site of 0.5 acres.
When was it filed?
The application was filed on 13 Jun 2023.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed manufacturing unit of Synthetic Organic Chemicals of 400 TPD production…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Sept 2023 |
| Application filed | 13 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Flymore Constructions Private Limited |
| Land area | 2,000 m² |
| Project cost | ₹10 crore |
| Village / locality | Bazpur |
| Taluk / tehsil | Bajpur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00137 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 18 Mar 2024 | Environmental approval granted | 0.5 acres | ₹10 crore |
| New project filed 17 Oct 2023 | Environmental approval granted | 0.5 acres | ₹10 crore |
| Early planning filed 13 Jun 2023 (this page) | Cleared for impact study | 0.5 acres | ₹10 crore |
In context
50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 0.5 acres, this one is smaller than 98% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bazpur, Bajpur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed manufacturing unit of Synthetic Organic Chemicals of 400 TPD… — environmental approval granted, 0 m away
- Proposed manufacturing unit of Synthetic Organic Chemicals of 400 TPD… — environmental approval granted, 0 m away
- Proposed manufacturing unit of Synthetic Organic Chemicals of 400 TPD… — lapsed, 0 m away
- M/s Uttaranchal Ispat (P) Limited at Plot Nos. D-1 to D-8, Pipalia Industrial… — environmental approval granted, 200 m away
- M/s Uttaranchal Ispat (P) Limited at Plot Nos. D-1 to D-8, Pipalia Industrial… — cleared for impact study, 200 m away
- Proposed sand, bajri & boulders Mine (Area = 1.0 ha) at Vill.- Sultanpur,… — environmental approval granted, 2.6 km away
- Proposed sand, bajri & boulders Mine (Area = 1.0 ha) at Vill.- Sultanpur,… — withdrawn, 2.6 km away
- "Sand, Bajri and Boulders Mining at Kosi River" At Khata No.- 414 Khasra no.… — environmental approval granted, 2.7 km away
More from Flymore Constructions Private Limited in Udham Singh Nagar
All 4 Flymore Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.