What is Developing? Open the mapMap

Cleared for impact studyIndustry · Udham Singh Nagar, Uttarakhand

Proposed manufacturing unit of Synthetic Organic Chemicals of 400 TPD production capacity at Plot No. F-17 To F-20 at Industrial Area Bazpur Site- I, Tehsil- Bazpur, District- Udham Singh Nagar, Uttarakhandby M/s Flymore Constructions Pvt. Ltd.

Proposed manufacturing unit of Synthetic Organic Chemicals of 400 TPD production capacity at Plot No. F-17 To F-20 at Industrial Area Bazpur Site- I, Tehsil- Bazpur, District- Udham Singh Nagar, Uttarakhandby M/s Flymore Constructions Pvt. Ltd is a proposed industrial project in Bazpur, Bajpur, Udham Singh Nagar, Uttarakhand. The site covers 0.5 acres. Its stated project cost is ₹10 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 Sept 2023).

See it on the live map All projects in Udham Singh Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed manufacturing unit of Synthetic Organic Chemicals of 400 TPD production capacity at Plot No. F-17 To F-20 at Industrial Area Bazpur Site- I, Tehsil- Bazpur, District- Udham Singh Nagar, Uttarakhandby M/s Flymore Constructions Pvt. Ltd is a proposed industrial project in Bazpur, Bajpur, Udham Singh Nagar, Uttarakhand. The site covers 0.5 acres.

Who is building it?

The applicant is Flymore Constructions Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 9 Sept 2023), as of 27 Nov 2026.

Where is it?

In Bazpur, Bajpur, Udham Singh Nagar, Uttarakhand.

How big is it?

It has a stated cost of ₹10 crore and a site of 0.5 acres.

When was it filed?

The application was filed on 13 Jun 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed manufacturing unit of Synthetic Organic Chemicals of 400 TPD production…

Project details

StatusCleared for impact study
Status since9 Sept 2023
Application filed13 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantFlymore Constructions Private Limited
Land area2,000 m²
Project cost₹10 crore
Village / localityBazpur
Taluk / tehsilBajpur
DistrictUdham Singh Nagar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00137

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 18 Mar 2024Environmental approval granted0.5 acres₹10 crore
New project filed 17 Oct 2023Environmental approval granted0.5 acres₹10 crore
Early planning filed 13 Jun 2023 (this page)Cleared for impact study0.5 acres₹10 crore

In context

50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 0.5 acres, this one is smaller than 98% of them.

28 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bazpur, Bajpur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Flymore Constructions Private Limited in Udham Singh Nagar

All 4 Flymore Constructions projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.