What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Dehradun, Uttarakhand

Environmental Clearance for Proposed Allopathic Pharmaceutical Preparations Manufacturing Unit by M/s Silver Line Laboratories Private Limited.

Environmental Clearance for Proposed Allopathic Pharmaceutical Preparations Manufacturing Unit by M/s Silver Line Laboratories Private Limited is an approved industrial building project in Shankarpur Hakumatpur, Vikas Nagar, Dehradun, Uttarakhand. The site covers 0.4 acres. Its stated project cost is ₹4.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 20 Feb 2024).

See it on the live map All projects in Dehradun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Proposed Allopathic Pharmaceutical Preparations Manufacturing Unit by M/s Silver Line Laboratories Private Limited is an approved industrial building project in Shankarpur Hakumatpur, Vikas Nagar, Dehradun, Uttarakhand. The site covers 0.4 acres.

Who is building it?

The applicant is Silver Line Laboratories Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 20 Feb 2024), as of 27 Nov 2026.

Where is it?

In Shankarpur Hakumatpur, Vikas Nagar, Dehradun, Uttarakhand.

How big is it?

It has a stated cost of ₹4.9 crore and a site of 0.4 acres.

When was it filed?

The application was filed on 9 Dec 2023.

Project details

StatusEnvironmental approval granted
Status since20 Feb 2024
Application filed9 Dec 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSilver Line Laboratories Private Limited
UseIndustrial
Land area1,800 m²
Plot area1,785 m² (19,214 sq ft)
Project cost₹4.9 crore
Village / localityShankarpur Hakumatpur
Taluk / tehsilVikas Nagar
DistrictDehradun
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00143

In context

165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 82% of them.

78 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Shankarpur Hakumatpur, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.