Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Oct 2023 |
| Application filed | 5 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pankaj Dhapola |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Maithara |
| Taluk / tehsil | Bageshwar |
| District | Bageshwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00173 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Oct 2023 (this page) | Environmental approval granted | 7.4 acres | ₹25 lakh |
| Early planning filed 13 Nov 2022 | Cleared for impact study | 7.4 acres | ₹25 lakh |
In context
144 applications in Bageshwar since January 2022 are in the same category (Mining): 125 approved, 6 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.4 acres, this one is smaller than 75% of them.
No other mining lease on record is within 500 m of this site; 24 have applied within 5 km.
Where it is
Maithara, Bageshwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/S Sidhbali Mines and Minerals — cleared for impact study, 0 m away
- Bhataura Rankot Soapstone Deposit — cleared for impact study, 700 m away
- Kholiyagaon Soapstone Deposit — environmental approval granted, 1.1 km away
- Kholiyagaon Soapstone Deposit — more information requested, 1.1 km away
- Kunoli, Seonera Soapstone Mining Project (Area: 52.34 Ha) — lapsed, 1.7 km away
- Bhauro Chobtta, Tok Kumaldev Soapstone Deposit (2.710 ha) — initial checks, 1.7 km away
- Bhauro Chobtta, Tok Kumaldev Soapstone Deposit — environmental approval granted, 1.7 km away
- Mining project by M/s Agari Minerals Syunebad — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.