Quick answers
What is this project?
Mining of Minor Mineral (Sand, Bajri and Boulder) from the river bed of Song-2 is an approved mining project in Kaluwala, Rishikesh, Dehradun, Uttarakhand. The site covers 338.2 acres.
Who is building it?
The applicant is Md Ukfdc.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Feb 2025), as of 27 Nov 2026.
Where is it?
In Kaluwala, Rishikesh, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹9.9 crore and a site of 338.2 acres.
When was it filed?
The application was filed on 30 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Feb 2025 |
| Application filed | 30 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Md Ukfdc |
| Land area | 338.2 acres (136.9 ha) |
| Project cost | ₹9.9 crore |
| Village / locality | Kaluwala |
| Taluk / tehsil | Rishikesh |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00193 |
In context
96 applications in Dehradun since January 2022 are in the same category (Mining): 65 approved, 23 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 338.2 acres, this one is larger than 98% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kaluwala, Rishikesh, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed 80 TPH Stone Crusher Plant by M/s Doon… — environmental approval granted, 1.7 km away
- Environment Clearance for existing RBM Screening Plant by M/s Surya Screening… — environmental approval granted, 2.8 km away
- Industrial project by M/s Hotel Vasudeva & Banquet Hall (Vasdaa) — environmental approval granted, 3.6 km away
- Village Pawwala Sauda Raipur Thano main Road To Shiv Mandir — forest land use approved, 4.2 km away
- Doon Valley Distillers — initial checks, 4.2 km away
- Proposed Play Ground Forest Land (0.97485) for Government Post Graduate… — forest land use approved, 4.7 km away
- Proposed Play Ground Forest Land (0.97485) for Government Post Graduate… — lapsed, 4.7 km away
- Mining of Sand, Bajri and Boulder (Minor Mineral) from Song-1 River bed — environmental approval granted, 5 km away
More from Md Ukfdc in Dehradun
- Mining of Sand, Bajri and Boulder (Minor Mineral) from Song-1 River bed — environmental approval granted
- Mining of Minor Mineral (Sand, Bajri and Boulders) From Jakhan-2 River Bed — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.