What is Developing? Open the mapMap

Environmental approval grantedMining · Udham Singh Nagar, Uttarakhand

Proposed Sand, Bajri & Boulder (river bed material) deposit at kosi river Khasra nos. 270 Min, Area- 1.218Ha village laxmipur-3, tehsil-Bazpur Distt- Udham singh Nagar, Uttarakhand.

Proposed Sand, Bajri & Boulder (river bed material) deposit at kosi river Khasra nos. 270 Min, Area- 1.218Ha village laxmipur-3, tehsil-Bazpur Distt- Udham singh Nagar, Uttarakhand is an approved mining project in Lachimipur, Bajpur, Udham Singh Nagar, Uttarakhand. The site covers 3 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 Mar 2024).

See it on the live map All projects in Udham Singh Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand, Bajri & Boulder (river bed material) deposit at kosi river Khasra nos. 270 Min, Area- 1.218Ha village laxmipur-3, tehsil-Bazpur Distt- Udham singh Nagar, Uttarakhand is an approved mining project in Lachimipur, Bajpur, Udham Singh Nagar, Uttarakhand. The site covers 3 acres.

Who is building it?

The applicant is Narendra Sharma.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 19 Mar 2024), as of 27 Nov 2026.

Where is it?

In Lachimipur, Bajpur, Udham Singh Nagar, Uttarakhand.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 3 acres.

When was it filed?

The application was filed on 17 Jan 2024.

Project details

StatusEnvironmental approval granted
Status since19 Mar 2024
Application filed17 Jan 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantNarendra Sharma
Land area3 acres (1.2 ha)
Project cost₹1.5 crore
Village / localityLachimipur
Taluk / tehsilBajpur
DistrictUdham Singh Nagar
StateUttarakhand
Location fromSite area on record
Our referenceWID-UK-00257

In context

96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 3 acres, this one is smaller than 70% of them.

5 other mining leases have applied within 500 m of this site; together with this one they cover 25 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 33 mining leases have applied within 5 km.

Where it is

Lachimipur, Bajpur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.