Quick answers
What is this project?
Environmental Clearance for Proposed 200 TPH Mobile Stone Crusher Plant by M/s Ram Kumar Contractor Private Limited is an approved industrial building project in Jassowala, Vikas Nagar, Dehradun, Uttarakhand. The site covers 1.9 acres.
Who is building it?
The applicant is Ram Kumar Contractor Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Jul 2024), as of 27 Nov 2026.
Where is it?
In Jassowala, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 1.9 acres.
When was it filed?
The application was filed on 23 Mar 2024.
Project details
| Official title | Environmental Clearance for Proposed 200 TPH Mobile Stone Crusher Plant along with 500 KVA DG set (For One Year) by M/s Ram Kumar Contractor Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 22 Jul 2024 |
| Application filed | 23 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ram Kumar Contractor Private Limited |
| Use | Industrial |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Jassowala |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00266 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.9 acres, this one is smaller than 55% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jassowala, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for establishment of proposed Mobile Stone Crusher… — environmental approval granted, 200 m away
- Environmental Clearance for establishment of proposed Mobile Stone Crusher… — environmental approval granted, 200 m away
- Environmental Clearance for existing Hot Mix Plant under violation by M/s Shri… — environmental approval granted, 500 m away
- Environmental Clearance for existing Hot Mix Plant under violation by M/s Raj… — environmental approval granted, 600 m away
- Proposed Khushalpur Sand, Bajri and Boulders Mining in Asan River by M/s… — environmental approval granted, 1 km away
- Proposed Khushalpur Sand, Bajri and Boulders Mining in Asan River by M/s… — cleared for impact study, 1 km away
- 14/8, Khushhalpur, Mining of Sand, Boulder, Bajri (RBM)/819 J Khasra No,/Area… — under wildlife review, 1 km away
- 14/8, Khushhalpur, Mining of Sand, Boulder, Bajri (RBM) — application filed, 1 km away
More from Ram Kumar Contractor Private Limited in Dehradun
- Environmental Clearance for short term establishment (Three year Only) of… — environmental approval granted