Quick answers
What is Proposed 100 TPH Stone Crusher Plant?
Proposed 100 TPH Stone Crusher Plant is an approved industrial project in Loarkha, Dhanaulti, Tehri Garhwal, Uttarakhand. The site covers 1.2 acres.
Who is building it?
The applicant is Tehri Stone Crusher.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Nov 2024), as of 27 Nov 2026.
Where is it?
In Loarkha, Dhanaulti, Tehri Garhwal, Uttarakhand.
How big is it?
It has a stated cost of ₹3.2 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 19 Sept 2024.
Project details
| Official title | Proposed 100 TPH Stone Crusher Plant along with 900KVA DG set by Tehri Stone Crusher at Khasra No 3036 to 3041,3043 to 3049,3053 to 3083,3085 to 3088 3092 to 3108 and 3116 to 3128.Mauja –Dhaulgiri ,Patti-Saklana ,Tehsil Dhanolti District Tehri Garhwal (Uttarakhand) |
|---|---|
| Status | Environmental approval granted |
| Status since | 26 Nov 2024 |
| Application filed | 19 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Tehri Stone Crusher |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Loarkha |
| Taluk / tehsil | Dhanaulti |
| District | Tehri Garhwal |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00273 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Loarkha, Dhanaulti, Tehri Garhwal, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Bajri and Boulder mine in Song River khasra Nos. 01, 09, 20, 487m, Area-… — environmental approval granted, 3.6 km away
- Sand, Bajri and Boulder mine in Song River khasra Nos. 01, 09, 20, 487e0,… — lapsed, 3.6 km away
- Proposed 60 Tph Stone Crusher Plant and Storage Facility — environmental approval granted, 5.8 km away
- Anand Chouk GoV Pumiping Water Supply Scheme — lapsed, 6.6 km away
- Anand Chowk GoV Pumping Water Supply Scheme — lapsed, 6.6 km away
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.442… — environmental approval granted, 6.7 km away
- Sand, Bajri and Boulder mine in Song River khasra Nos. 01M, Area- 1.00 ha by… — environmental approval granted, 7 km away
- Sand, Bajri and Boulder mine in Song River khasra Nos. 01e0, Area- 1.00 ha by… — lapsed, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.