What is Developing? Open the mapMap

Cleared for impact studyMining · Hardwar, Uttarakhand

Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no 220, 221, 222, 184 Village- Daulatpur Hazratpur Urf Budhwashaheed-I, Tehsil- Bhagwanpur & District- Haridwar, UK (Area- 4.0227 Ha)

Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no 220, 221, 222, 184 Village- Daulatpur Hazratpur Urf Budhwashaheed-I, Tehsil- Bhagwanpur & District- Haridwar, UK (Area- 4.0227 Ha) is a proposed mining project in Budhwa Shahid, Roorkee, Hardwar, Uttarakhand. The site covers 9.9 acres. Its stated project cost is ₹1.8 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 14 Apr 2026).

See it on the live map All projects in Hardwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no 220, 221, 222, 184 Village- Daulatpur Hazratpur Urf Budhwashaheed-I, Tehsil- Bhagwanpur & District- Haridwar, UK (Area- 4.0227 Ha) is a proposed mining project in Budhwa Shahid, Roorkee, Hardwar, Uttarakhand. The site covers 9.9 acres.

Who is building it?

The applicant is Amit Patwari.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 14 Apr 2026), as of 27 Nov 2026.

Where is it?

In Budhwa Shahid, Roorkee, Hardwar, Uttarakhand.

How big is it?

It has a stated cost of ₹1.8 crore and a site of 9.9 acres.

When was it filed?

The application was filed on 7 Jul 2024.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no 220, 221,…

Project details

StatusCleared for impact study
Status since14 Apr 2026
Application filed7 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAmit Patwari
Land area9.9 acres (4 ha)
Project cost₹1.8 crore
Village / localityBudhwa Shahid
Taluk / tehsilRoorkee
DistrictHardwar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00326

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 Nov 2024Environmental approval granted9.9 acres₹1.8 crore
New project filed 27 Jul 2024Under wildlife review9.9 acres₹1.8 crore
Early planning filed 7 Jul 2024 (this page)Cleared for impact study9.9 acres₹1.8 crore

In context

61 applications in Hardwar since January 2022 are in the same category (Mining): 28 approved, 23 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 84% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 24.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.

Where it is

Budhwa Shahid, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Amit Patwari in Hardwar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.