Quick answers
What is this project?
Environmental Clearance for Proposed Commercial Building & Hotel Facility for Mr. Karanveer Singh S/o Mr. Inder Singh and Mrs. Sangeeta Singh W/o Mr. Inder Singh is an approved mixed-use project in Majri Grant, Rishikesh, Dehradun, Uttarakhand. It plans 172 units on 9.2 acres.
Who is building it?
The applicant is Karanveer Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Nov 2024), as of 27 Nov 2026.
Where is it?
In Majri Grant, Rishikesh, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹70 crore and a site of 9.2 acres.
When was it filed?
The application was filed on 15 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Nov 2024 |
| Application filed | 15 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Karanveer Singh |
| Use | Mixed use |
| Units | 172 |
| Land area | 9.2 acres (3.7 ha) |
| Project cost | ₹70 crore |
| Village / locality | Majri Grant |
| Taluk / tehsil | Rishikesh |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00330 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.2 acres, this one is larger than 85% of them.
49 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Majri Grant, Rishikesh, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road Safety Improvement of existing 4 lane section of Dehradun-Lal… — forest land use approved, 850 m away
- Environmental clearance for proposed establishment of 200 TPH Stone Crusher… — environmental approval granted, 950 m away
- Building project by Goodsol Industries Llp — environmental approval granted, 1.1 km away
- Industrial project by Uraenabh Haps Private Limited — environmental approval granted, 1.3 km away
- Environmental Clearance for proposed Modification/ Modernization of Existing… — environmental approval granted, 1.3 km away
- Environmental Clearance for proposed manufacturing unit of finished soles by… — environmental approval granted, 1.3 km away
- Environmental Clearance for Proposed Expansion of production capacity of Shoes… — environmental approval granted, 1.4 km away
- Environmental Clearance for proposed expansion of manufacturing unit of Sole… — environmental approval granted, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.