Quick answers
What is Phata Byung Hydro Electric Project (76 MW)?
Phata Byung Hydro Electric Project (76 MW) is a proposed water and irrigation project in Barasu, Ukhimath, Rudraprayag, Uttarakhand. The site covers 15.7 acres.
Who is building it?
The applicant is Mandakini Jal Urja Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Apr 2024), as of 27 Nov 2026.
Where is it?
In Barasu, Ukhimath, Rudraprayag, Uttarakhand.
How big is it?
It has a stated cost of ₹1,018.5 crore and a site of 15.7 acres.
When was it filed?
The application was filed on 6 Mar 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Apr 2024 |
| Application filed | 6 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Mandakini Jal Urja Private Limited |
| Land area | 15.7 acres (6.4 ha) |
| Project cost | ₹1,018.5 crore |
| Village / locality | Barasu |
| Taluk / tehsil | Ukhimath |
| District | Rudraprayag |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00378 |
In context
44 applications in Rudraprayag since January 2022 are in the same category (Water & irrigation): 1 approved, 12 filed or under review, and 30 withdrawn, lapsed or rejected. At 15.7 acres, this one is larger than 98% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barasu, Ukhimath, Rudraprayag, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Badasu Water Supply Scheme — lapsed, 1.5 km away
- Tarsali Water Supply Scheme — lapsed, 2 km away
- Nyalsu Water Supply Scheme — lapsed, 3.4 km away
- Byung Water Supply Scheme — lapsed, 3.8 km away
- Tyuri Water Supply Scheme — lapsed, 5 km away
- 06 KLD STP and 10 KLD STP (with toilets block 10M+5F) near exit gate of… — in-principle approval, conditions pending, 5.3 km away
- Devsal Kothera Water Supply Scheme — lapsed, 5.6 km away
- Bansu Water Supply Scheme — lapsed, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.