Quick answers
What is this project?
Environmental Clearance for Proposed Manufacturing Unit of Cosmetic Products by M/s KN Cosmo Ayur Pharma is an approved industrial building project in Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The site covers 0 acres.
Who is building it?
The applicant is Shiv Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Jul 2024), as of 27 Nov 2026.
Where is it?
In Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹1 crore and a site of 0 acres.
When was it filed?
The application was filed on 6 Mar 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Jul 2024 |
| Application filed | 6 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shiv Singh |
| Use | Industrial |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Central Hop Town |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00440 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0 acres, this one is smaller than 99% of them.
84 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Signature Phytochemical Industries Unit–2 — environmental approval granted, 350 m away
- Signature Phytochemical Industries Unit–3 — environmental approval granted, 450 m away
- Signature Phytochemical Industries - UNIT I — environmental approval granted, 450 m away
- Signature Phytochemical Industries - UNIT I — environmental approval granted, 450 m away
- Environmental Clearance for Proposed Feed Supplements Manufacturing Unit of by… — environmental approval granted, 550 m away
- EAST AFRICAN (INDIA) OVERSEAS - Unit 4 — environmental approval granted, 650 m away
- Industrial project by Hab Pharmaceuticals & Research LTD. — environmental approval granted, 650 m away
- Industrial project by Mancare Laboratories Pvt. Ltd. — environmental approval granted, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.